
Description
Single-story 4 bedroom 3 bath home with separate study, 2 car attached garage and covered patio. This home features the Optional Stone Front Elevation. Spacious family room features vaulted ceiling and is open to island kitchen and casual dining. Vaulted ceiling continues out on the covered patio. Three-sided seating offers plenty of room to serve a crowd at the large granite kitchen island. The kitchen also features upgraded granite, and under cabinet lighting. Private Owner's retreat overlooks backyard and bath includes separate shower, large garden tub, two sinks, and a roomy closet. Homesite is located 2 homes away from a greenspace park with a covered picnic pavilion and fenced dog park area. Note: The home is under construction, as such, photos are REPRESENTATIVE and not of the actual home. A photo of the actual selections planned for this home is included in the photo gallery. For more info, contact Chesmar Homes in Hunter's Creek. AUGUST 2022 estimated completion.
-
4BEDS
-
0.15ACRES
-
3BATHS
-
01/2 BATHS
-
2,341SQFT
-
$160$/SQFT
School Information
Description
Single-story 4 bedroom 3 bath home with separate study, 2 car attached garage and covered patio. This home features the Optional Stone Front Elevation. Spacious family room features vaulted ceiling and is open to island kitchen and casual dining. Vaulted ceiling continues out on the covered patio. Three-sided seating offers plenty of room to serve a crowd at the large granite kitchen island. The kitchen also features upgraded granite, and under cabinet lighting. Private Owner's retreat overlooks backyard and bath includes separate shower, large garden tub, two sinks, and a roomy closet. Homesite is located 2 homes away from a greenspace park with a covered picnic pavilion and fenced dog park area. Note: The home is under construction, as such, photos are REPRESENTATIVE and not of the actual home. A photo of the actual selections planned for this home is included in the photo gallery. For more info, contact Chesmar Homes in Hunter's Creek. AUGUST 2022 estimated completion.